This page's content :

PCDF

Protein Cystallisation Diagnostics Facility

Pictures: reactor filling, assembly and transportation (at B.USOC)PCDF


PCDF
Preparation for the reactor filling. Cleaned reactors in a clean bench..

PCDF
Beginning of reactors assembly
Top
PCDF
Complete reactors before the filling in with the protein solution

PCDF
Greasing of the mobile parts (here an injection piston)
Top
PCDF
Greasing of the mobile parts (here an injection piston)

PCDF
Complete reactors after the greasing
Top
PCDF
Vue of the packing

PCDF
Filling the reactor with the protein
Top
PCDF
Filling the reactor with the protein

PCDF
Packing of the reactors in individual transport container
Top
PCDF
Packing of the reactors in individual transport container
Top
PCDF
Packing of the reactors in individual transport container

PCDF
Individual transport containers inserted in the main transport container with temperature control capability
Top
PCDF
Transport container with temperature control capability ready for the shipment to the Kennedy Space Center (KSC)

PCDF
"Experiment Boxes" containing the reactors (their integration into the Process Unit (PU) of the PCDF will take place at KSC under Astrium responsibility)
Top
PCDF
Process Unit with the "Experiment Boxes" containing the reactors (vue of the engineering model)

PCDF
Process Unit after the addition of the optics (camera) just before the final close out (vue of the engineering model)
Top